Photo Gallery
first | previous
| next | last
| photo gallery home
(45 of 49)

August 14, 2003
This test was a tethered test where the rocket was allowed to lift
itself up, but only about 8 inches. Unfortunately, the resulting stresses caused
the feedline
tubes to bend and this was the result. However, we were able to collect high
frequency
accelerometer data on this test, available in the Documentation
section.
(Note the ice still remaining on the cold LOX tank.)