Photo Gallery

first | previous | next | last | photo gallery home
(36 of 49)

Photo: Cold flow system tests on Test Stand

Cold flow system tests on Test Stand 116 were run throughout July
2003 to verify the tank system was providing adequate flows and
pressures to the combustion chamber. Lessons were learned about how
to load and prepressurize the system.